Site Visist 1: A large portal frame warehouse is being constructed beside the Mornington Delivery Centre for Australia Post.
View of site

Closer view of large stanchions and beams showing temporary bracing and pre welded cleats on top of the beams.


Triangular section welded to the UB ready for the pre-cast concrete panel to be bolted to.



Pinned connection ? Note numbering to ensure the right column is in the right spot!